Almost done

Last week my final walk through was booked for the 29th. Things are certainly looking like they are wrapping up. Last week was the first time the house had been fully locked up and it’s looking far more complete with smaller things being added such as the bench tops, taps and fittings. Hopefully there won’t be many things to fix and the final bank valuation can take place.

IMG_20150614_113033

 

IMG_20150614_113853

IMG_20150614_113417

IMG_20150614_113751

IMG_20150614_113407

IMG_20150614_113208

IMG_20150614_113235

IMG_20150614_113539

Driveway

Got round to the house this weekend and found the driveway had been completed. There are still some things to go but its getting to look more and more like the finished product each week.

Here are some pictures taken over the weekend.

Front

front-drive

Hallway

front-hall

Left side from garage

Left-side

Ensuite

ensuite

Kitchen

kitchen

Living room area

living-area

Rear bedrooms

alfresco-rear

Light switches

light-switch

Left side from rear

alfresco-side