Colours and Electrical

So, this week I had my colour selections and electrical done. All I can say is, there is a huge amount of things to select and its all a bit of a whirlwind. I’m still going over things that I’ve missed and trying to sort it all out. Good news is, about 1/2 a week later and I think I have everything!

Hopefully these colours will look OK. Posted below for posterity. I will need to get the actual names of some of these and update the post.

External 2

External Colours

Carpet

Carpet and floor tiles

Kitchen

Kitchen benchtop, cupboards and splash back

Bathroom

Bathroom and Ensuite

Electrical

Initial electrical diagram

The electrical diagram is only switches and lights, added to this is the alarm, sensors, home automation panels and switches and data points. Hopefully later this week I will be a final quote for everything and be signing this section off.

I’m quite looking forward to the final electrical quote as, not only were things cheaper than I expected (although, still crazy) I was also able to add extra goodies and still be under budget, such as an energy storage (batteries) system. This means that during a power cut I should still be able to internet, watch tv, cook and have lights/showers etc. Also, it should save significantly on my power bill.

Footpath

A couple of weeks later and there is now a footpath. I talked to the land developer today and they said they were ahead of schedule on the development and were now expecting the land to title mid to late May. This means that if all goes well the build could start at the beginning of June.

FootpathThere is now a footpath here

Plot of land

Starting to look more like a propertySealed road

Sealed Road

Accessway

Accessway onto the property